so we have got gone through the dpw, dbi approved the plans. we haven't quite got it all signed off because we were told to stop on it somewhere along the line when the dbi permit got approved. we did the load studies for the people coming and going and access and push bars and the keys. so it's pretty easy to walk in and out of the door, it works and it can be accessible, if it needs to be. i'm not sure how you would get a wheelchair in the building once it's in there, but it's not a problem. we have to do something with the grade there, but we haven't finished a lot of this stuff and somebody was talking about the structure. we haven't completed it because we were told to stop on it. which they are all pretty simple things to complete, the structure. i think it's a good thing for the building. it keeps them clean and safe and it's for our tenants and we have to provide a clean and quiet and safe place for our tenants, who are stuck in the middle there. i don't live there, but i do see the problems and know the cost it takes to keep it cleaned